Please note:
  • Please read our water supply application guidance notes before completing this form

  • Missing information may delay the processing of this application

  • Any applications can be paid at any Council Service Centre 

  • Commercial applications will need to attach an A3 scalable site plan showing all existing and proposed water supply, including meter locations, pipe material and size

  • Full payment is required before the new connection is installed
  
Page 1
Applicant / Agent









    
Legal owner of the property






    
Property requiring water supply




Page 2

Application fees
Details of the person or company responsible for the fees and charges associated with this application. 

Refer to our website for a full list of fees and charges.









   
Property





Minimum 3 months from date of application

Page 3

Services required







Refer to your plumber or designer for this information

Page 4

Building consent



Resource consent



Backflow prevention

Important:
Water connection can not be installed until Backflow Prevention is in place. 



Subdivision consent



Page 5

Attachments

Residential plan attachments

   
General

   
Authorisation
  • I hereby declare that the information given on this application is true and correct. I am the owner or have been authorised by the owner to make this application.

  • I have read and understood the guidance notes.

  • I agree to the terms and conditions of supply as determined by the Christchurch City Council’s current Water Supply, Wastewater and Stormwater Bylaw 2014.

  • I understand that full payment is required before a new water connection can be completed. 

Need assistance with this form?